Digital waste tracking for construction and demolition waste
Construction work produces thousands of small loads: skips from site clearance, grab lorries, concrete, brick and timber arisings. From October 2026, permitted sites receiving that waste have to record every load digitally and submit it to Defra within two working days.
LoadLog handles the volume with templates, so a regular skip takes seconds to log from a phone or tablet at the gate.
Before a load is accepted, the carrier registration is checked against all four UK public registers.
Contractors often keep their own spreadsheets of movements. Those rows can be imported by CSV instead of typed: the columns are matched, the preview shows what will be created, and the records arrive as drafts ready to submit in a batch.
The sample library includes construction and demolition templates for concrete, bricks, mixed concrete, brick and ceramic, and wood.
Start free with five notes a month, or use Compliance Lite at £12 a month for unlimited notes and bulk entry. Sites handling thousands of small loads can be fully compliant from day one.
Start your free account today. No credit card needed.

2027 exemption transition
Four exemptions carry the dates that matter on a construction and demolition site. T4, storing and preparing waste for further treatment, reaches the end of its transition on 6 July 2027. U1, use of waste in construction, S1, storing waste in secure containers, and S2, storing waste at a secure site, all end on 6 January 2028.
None of the four carries continued operation, so the date that applies to each code is the date its new conditions take effect.
These dates are subject to parliamentary approval. A site that becomes permitted becomes a permitted receiving site, and digital waste tracking then applies to every load received.